Two VQN fast-charging stations in front of a modern administrative building with free parking
For location owners

Your space. Your regular income.

We build and operate a VQN fast-charging station in your parking lot. You collect the rent.

How it works →
Simple principle

2 m² that will start earning for you.

Summary
  • CZK 0 investment. 0 operational worries.
  • We pay rent one month in advance.

You provide 2 m² in your parking lot. We invest in the technology, install the station, and operate and maintain it 24/7. You simply collect regular rent.

No station of your own. No maintenance. No daily management. Plus, VQN brings EV drivers to your location, where they spend about 25 minutes while charging. The station is available in navigation apps from day one.

Have 2 m² in the right place? Start earning from it.

01

Your investment: CZK 0.

ValoriQ Networks finances the technology, delivery, and installation. You provide a suitable location and collect regular rent.

02

Your time: 0 hours.

We handle the monitoring, payments, 24/7 service, and customer support. You don't have to worry about station operations.

03

Your space: just 2 m².

A suitable parking space is all it takes. The station requires no anchoring or building permits, and its installation involves minimal disruption to your site.

Want to know what VQN specifically covers at your location?

BENEFITS FOR YOUR LOCATION

Rent is just the beginning.

A charging station does more than just generate regular income. It increases visitor comfort, attracts EV drivers, and enhances the appeal of your entire location.

01

Regular rent

ValoriQ Networks pays the agreed-upon rent for the use of your space. You get a regular income with no investment in technology and no operational hassles.

02

An extra service for visitors

Fast charging expands your location's services and enhances comfort for customers, tenants, employees, and other visitors.

03

More time on-site

During charging, drivers spend approximately 25 minutes on-site, where they can use the surrounding shops, restaurants, and other services.

04

A more modern and attractive site

Charging infrastructure boosts your site's appeal, promotes a modern image, and shows you're ready for the future of e-mobility.

We'll assess your location's potential for free, with no obligation.

A ValoriQ Networks fast-charging station located in an urban area
VQN TECHNOLOGY 150 kW where others need a transformer station. A compact solution for real-world parking lots. No overly complex infrastructure, no lengthy construction.

Want a station like this at your location?

How it works

From address to first charge
in 2–4 weeks.

You offer the location and sign the lease. We take care of everything else—site assessment, connection, transport, installation, inspection, and ongoing operation.

01

Send us your address

Send us some basic information about your location. Within a week, we'll tell you if it's suitable for VQN and how much we can offer you for it.

02

We assess the location

We evaluate the site's potential, accessibility, parking capacity, and the technical requirements for installing a station.

03

We agree on the partnership

If the location is approved, we'll prepare a specific proposal for the station placement and the lease terms. You sign the lease agreement.

04

We install and launch

VQN handles the transport, connection, installation, and inspection. The installation itself takes about 1 day.

05

You collect rent. We operate.

We operate and monitor the station 24/7. You don't deal with daily operations and simply receive the agreed-upon rent.

You sign the lease. We handle the connection, transport, installation, inspection, and operation.

Send us your address. Within a week, we'll tell you if the location is suitable and how much we can offer you for it.

The partnership in numbers

Minimum from you. Maximum from us.

A suitable location and a basic connection are all you need. ValoriQ Networks handles the investment, installation, operation, and service.

01
2 m²
ALL THE STATION NEEDS

Just a small part of a parking area. The station is self-supporting and requires no anchoring.

02
from CZK 2,000 / month
REGULAR RENT

For the use of a parking space, you get an agreed-upon regular income with no investment in technology.

03
1 month in advance
RENT IN ADVANCE

We pay the agreed-upon rent one month in advance. You provide the space, we take care of operations.

04
3×32 A
A STANDARD CONNECTION IS ENOUGH

The integrated battery storage allows for operation with low demands on the electrical connection.

05
24/7
HASSLE-FREE OPERATION

ValoriQ Networks handles the monitoring, service, and daily management of the station.

06
2–4 weeks
FROM SIGNING TO FIRST CHARGE

We handle the connection, transport, installation, inspection, and launch.

Let's calculate the potential for your specific location.

Where we're looking for locations

Have a place
where people pass by?
It can start earning you money.

Easily accessible places with regular vehicle traffic and nearby services have the greatest potential. If you're not sure whether your location meets the requirements, we'll check it for you.

01

Retail & services

  • Shopping centers
  • Retail parks
  • Hotels
  • Restaurants
  • Car dealerships
  • Car Service Centers
02

Business & city

  • Administrative buildings
  • Office parks
  • Busy parking lots
  • P+R parking lots
  • Residential complexes
  • Urban hubs
03

Transport locations

  • Petrol stations
  • Major transport arteries
  • Highways
  • Transit routes
  • Rest areas
  • Motorway restaurants

What we're looking for: an easily accessible parking space a 3×32 A connection within reach high vehicle traffic

Have a similar location? Let us check its potential.

HAVE A SUITABLE LOCATION?

Send us the address.
You'll know where you stand within a week.

Just an address and some basic information is all it takes. We'll assess your location and tell you if it's suitable for VQN and how much we'll pay you for it.

On-site photovoltaics

Turn your solar surplus into additional income.

Have your own photovoltaic system? VQN stations can use your locally generated power. You'll not only collect regular rent for the space but also earn additional income from the energy you produce yourself.

An integrated battery storage system links power generation, accumulation, and its subsequent use for EV charging. We always design a custom solution based on the technical specifications of your location.

01
Generate
Photovoltaics
02
Store
Battery storage
03
Monetize
Charging station

Producing your own power? Find out how to use it for EV charging.

Next step

Your parking lot can start generating income.

Send us your address and some basic details. We will assess your location's potential and technical feasibility, then prepare a specific partnership proposal.